Projects

Perdala Estates, Kasaragod · 2025 · Solar plants

Perdala 20 MW solar plant

Laterite at Perdala Estates, Kasaragod

A 20 MW ground-mount plant on 32 hectares at PCK’s Perdala Estates. Same consortium: Sustainize for local compliance, 110 kV evacuation, and the site.

Perdala Estates, Hosdurg taluk, puts 32 hectares of barren laterite under a 20 MW plant. Coordinates in the DPR are 12°36'55.4"N, 75°06'22.2"E. The land is a marked portion of a larger PCK holding.

The report was prepared with technical support from Climatenza Solar and Sustainize Technologies. Sustainize’s brief is local: KSEB and ANERT files, the 110 kV evacuation package, and the climate and logistics of Kasaragod.

First-year generation is estimated at 31.11 million units. Project cost in the DPR is about ₹132.95 crore. Technology follows the Cheemeni note: N-Type TOPCon, string inverters, laterite foundations.

Practice

Registered office

5/14, Mukkolakkal, ChakkittaparaThandorapara, KoyilandyKozhikode, Kerala – 673526

Kozhikode

Opposite to Thriveni Super MarketNear Bus stand, Perambra 673525Kozhikode

Thiruvananthapuram

TC 24/3220, Cosmos Consultancy BuildingBelhaven Garden, KawdiarThiruvananthapuram – 695003

Ernakulam

O/o Solar Apt Tech Solutions Private Ltd.First Floor, Door 11/78Njarakkal Road, PerumpillyNjarakkal, 682505Ernakulam, Kerala